Sunday, 4 October 2015

Track and Wiring

I have been busy laying track and wiring it all up in the last few months in preparation to show progress to date at the 2mm Association AGM held yesterday.  A deadline always seems to make things progress a little bit quicker.

I had such an enjoyable day talking to fellow modellers that I forgot to take any photos.  I have therefore taken a photo when I arrived home to have a record of how it looked on the day of the AGM.

60022 with 18 SPA wagons travels towards Doncaster as 150144 is just arriving at Swinton


Sunday, 12 July 2015

Easitrac

Overview of progress to date


















I have been busy laying Easitrac for the last few weeks,  I have now completed most of the track for the scenic section except for the area around the turnouts. All has gone reasonably well though I do find that the Easitrac glue dries very fast which can make laying the track difficult. Thankfully most of the track is straight so I aligned the track against a ruler before pushing it into the glue.

Test running track with a selection of locomotives




The electrical feeds are provided to the track via brass sleepers.

Electrical feeds


















It was pointed out to me recently that the sprue that holds two sections of Easitrac sleepers together are actually set to the 6ft way.  I have taken advantage of this by assembling the Easitrac with sprues in place every two or three sections to maintain the 6ft way gap.  Once the track has been glued I then cut through the sprues to remove them.

Sprues ready to be cut once glue has dried 


















At baseboard joints I have used brass sleepers to provide extra strength.


Brass sleepers at baseboard joints

Monday, 6 April 2015

Turnouts








I have finally finished the three F20 turnouts that I need for my layout. The single right hand turnout is around 500 mm long and the right hand crossover is around 750 mm.


The turnouts are constructed from flat bottom rail soldered to my own custom etched chairplates on PCB sleepers. It took around 6 months to draw and etch my own chairplates and then a further 6 months to construct the turnouts. I have calculated that I have soldered over 900 chairplates in total; I am glad I didn't calculate this before I began soldering!









Tuesday, 30 September 2014

Baseboard edging

I have taken some photos of the baseboard edging and baseboard ends. These are laser cut from a mixture of 4 mm mdf and 4 mm ply. The drawings were prepared in CorelDraw.

Baseboard edging templates


Brass pattern makers dowels for alignment , holes for these also laser cut

Bridge and baseboard edging viewed from South

Bridge and baseboard edging viewed from North

View of layout from above showing progress to date

View of layout from side showing progress to date


Sunday, 28 September 2014

Weathering

I have had a couple of my models weathered and detailed by Mercig Studios. I have taken a couple of photos of them passing through Swinton.

58003

47539


Wednesday, 4 June 2014

Bridge

Have now completed my laser cut bridge except for painting and etch fencing for the bridge sides.

















Friday, 14 March 2014

Mk3

Finally have some mk3 coaches including buffet for my two swallow livery HST 125.