|
Overview of progress to date |
I have been busy laying Easitrac for the last few weeks, I have now completed most of the track for the scenic section except for the area around the turnouts. All has gone reasonably well though I do find that the Easitrac glue dries very fast which can make laying the track difficult. Thankfully most of the track is straight so I aligned the track against a ruler before pushing it into the glue.
|
Test running track with a selection of locomotives |
The electrical feeds are provided to the track via brass sleepers.
|
Electrical feeds |
It was pointed out to me recently that the sprue that holds two sections of Easitrac sleepers together are actually set to the 6ft way. I have taken advantage of this by assembling the Easitrac with sprues in place every two or three sections to maintain the 6ft way gap. Once the track has been glued I then cut through the sprues to remove them.
|
Sprues ready to be cut once glue has dried |
At baseboard joints I have used brass sleepers to provide extra strength.
|
Brass sleepers at baseboard joints |